We focused today on inventorying all our parts once again. In doing that, we found a number of parts that were missing / not created and spent some time cutting 2x1 to length, as well as turning some thunderhex and tapping it. Patrick was running the CNC the entire time, and only messed up a couple times lol. The first elevator rails should be done by tomorrow so we can start putting together the bearing blocks. CAD is working on a battery mount, as well as figuring out the linkage to raise and lower the intake.